What do you want to see happen to Diablo Canyon Power Plant and its surrounding lands after it shuts down?

  • Public access. Let's build a network of trails and other offerings on the 12,000 acres of beautiful coastline.
    13 votes (27.66%)
  • Conservation. Leave the land alone and make sure it can't be developed.
    5 votes (10.64%)
  • Repurpose the desalination plant for SLO County water needs.
    23 votes (48.94%)
  • I don't know, but get me away from that radioactive spent fuel!
    6 votes (12.77%)
Pin It
Favorite

Comments

Subscribe to this thread:

Add a comment